GeoMiner Free earth-science tools

Built by a geologist

Ore/Waste Delineation

Delineating ore from waste is the core function of grade control. Polygon Generation Inverse Distance Weight nearby samples by inverse of distance. Kriging Geostatistical method incorporating spatial variability. Geological Domaining Respect geological boundaries in estimation. Cut-off Grades Economic Cut-off Minimum grade that pays for mining and processing. Operational Cut-off May differ based on mill blend requirements. Material Destinations - Mill feed ore - Stockpile marginal grade - Waste dump - Low-grade stockpile Marking in Field - Paint or flag ore/waste boundaries - Communicate with operations - Adjust for dig tolerance

  • All lessons in Open Pit Geology — Return to the complete Open Pit Geology course outline.
  • Previous lesson: Bench Mapping — Bench mapping documents the geology exposed on mining faces. Purpose - Validate geological model - Identify structural controls - Guide grade control …
  • Next lesson: Production Sampling — Ongoing sampling during production monitors mill feed grade. Sample Points - Truck sampling random selection - Stockpile sampling - Conveyor belt…

Verification resources

Cross-check terminology, classification, methods, and safety with these authoritative external resources.

Read GeoMiner's editorial methodology.

JavaScript is loading the interactive GeoMiner experience. The identification tools provide educational candidates, not laboratory confirmation.