GeoMiner Free earth-science tools

Built by a geologist

Pit Optimization

Pit optimization determines the ultimate pit limits. Lerchs-Grossmann Algorithm - Industry-standard method - Maximizes NPV Net Present Value - Creates nested pit shells at different revenue factors Inputs - Block model with grades - Processing recovery curves - Mining and processing costs - Metal prices - Geotechnical parameters slope angles Outputs - Ultimate pit limit - Phase pushback designs - Tonnage schedules - Strip ratio by period Sensitivity Analysis - Test different metal prices - Vary cost assumptions - Assess geological uncertainty

Verification resources

Cross-check terminology, classification, methods, and safety with these authoritative external resources.

Read GeoMiner's editorial methodology.

JavaScript is loading the interactive GeoMiner experience. The identification tools provide educational candidates, not laboratory confirmation.